Centene Corporation HQ's

Discuss new retail, dining, business and residential projects within the City of Clayton, the center of St. Louis County government.
First unread post1015 posts
Moorlander, do you work at the Centene Tower? You have a unique view from your office if you do! A daily update when you walk in!


Sent from my iPhone using Tapatalk
It looked like they were putting on the tower crane today. I drove by this morning and they had the street closed off and were putting in support pieces.
This building will be tall. It will be the tallest built in Missouri this decade.

Correction- it will be the tallest.

Sent from my iPhone using Tapatalk
First version of the tower crane is up and operational. It's only about 1/3 of the height I expect it to reach once they get the foundation and first few floors completed, but we at least have in ready to get this baby going!
I think it's high time for SkyscraperPage to list that one as "under construction" rather than "proposed." :)
What does the crane look like? I left town? Like all the other ones I guess?
It's a tall steel vertical structure with a horizontal rotating arm perched on top. :wink:
Is it tall? That’s what I mean


Sent from my iPhone using Tapatalk
It's actually not that tall right now. Only about 1/2 or 2/3 of the height of the existing Centene building. Expect it to grow once they get the below ground stuff complete and steel starts rising.
Image
Yes. Cool view of it. Will be the tallest in Clayton so HIGHLY Visible!
Image
There will be two cranes for this project.


Sent from my iPhone using Tapatalk
They're drilling shafts for the foundation on the future site of the parking garage.
Image
Are you able to get any shots of the area on the other side of Wellbridge? It'll be really fun to see steel rise at the tower and the street wall fill out on Forsyth at the same time.
^^Cool shot. Thanks for posting.
Image
Image
Is the second shot work beginning on the garage?
newstl2020 wrote:
Wed Jul 12, 2017 11:49 pm
Is the second shot work beginning on the garage?
They are doing work all the way over to where the arts center or whatever it will be called is located. Wellbridge is still there but everywhere else they have equipment working. That pic I think is (like you asked) where the parking garage is going or at least part of it.

I drive by this everyday on my way to work. The activity seems to be picking up in the garage area.
️ WARNING️
THIS POST IS NSFW

"Crane Porn"
Image

Image
So satisfying to see 2 cranes here. To bad there won’t be a third
You may be in luck, depending on what they deem necessary for the parking garage! At the very least I'd expect to see a smaller mobile crane or two over there.
^I would think with the extent of the garage we will most likely see another. Additionally, depending on how much firepower they put behind this, we may have cranes for tower 3 in the air while 2 is still being completed.

Super cool to see. As everyone here I think agrees we would have preferred this downtown, but it's awesome to see a company build out an "urban" campus in the greater StL area. Hopefully more in the pipeline after this one.